Adams Solar
Adams County, Washington
First solar farm in Washington State
27.9MWdc / 19.2MWac
Capacity

- Building in an area not knows for a lot of sunlilght
- Permitting in a new state
- Making the economics work in a region with inexpensive hydro electricity
Benefits
- City Tax Revenue
- Clean energy power for local customers, farming activities
The Ventura BESS system provides clean energy and prevents over 280 Metric Tons of Carbon Dioxide emissions from entering the environment when operating at full output.
That’s equivalent to:
1,531 gallons
of gasoline consumed
15,039 pound
of coal burned
34,196 miles
driven by an average passenger vehicle